Follow by Email

Friday, 2 March 2012

The small jobs are really the BIG jobs

Timber for the base of the battery box I think it may be close to being finished

Secured in 

Dome nuts

Finely the shunt arrives and mounted to the acrylic, I made up 2 BUS bars to connect the fuse with the shunt 

From the side 

Battery box bolted back into the frame with Pot box and main contactor 

Put 50mm lugs on the connectors to check cable won't interfear or fowl when in place